3520V-38A8-1CC-22R Double Pump Instructions

2025-06-26

Yihe Hydraulics is a well-known hydraulic pump manufacturer, and its products are widely used in the industrial field. This article will introduce the instructions for use of the 3520V-38A8-1CC-22R double pump in detail to help users better understand and operate these equipment.

1. Product Overview

Model: 3520V-38A8-1CC-22R

Type: Double vane pump

Material: Cast iron

Application: Construction machinery

Applicable medium: Hydraulic oil

Working pressure: 207 bar

Volumetric efficiency: more than 90%

Noise level: as low as 62 dB(A)

2. Preparation before use

① Inspection:

Check whether the vane hydraulic pump and motor are stuck or inflexible.

Check whether the packing is tight and whether the connections of each component are firm and reliable.

Check whether the lubricating oil (grease) is appropriate.

Check whether the pressure gauge, safety valve, and overflow valve are sensitive and easy to use.

Check whether the inlet and outlet valve switch positions are correct.

② Installation:

The installation of the double pump should follow the installation guide provided by the manufacturer to ensure that the pump body is stable and connected correctly.

Avoid excessive vibration and impact on the pump body during installation.

3. Operation and adjustment

① Startup:

Before starting, the discharge valve and related valves on the discharge pipeline must be opened.

Start the motor and observe the operation of the pump to ensure that there is no abnormal vibration and noise.

②Operation:

During operation, it is forbidden to close the discharge valve to avoid damaging the pump or pipeline, or even burning the motor.

Check the lubrication of the pump regularly to ensure that all parts are well lubricated.

By observing the instrument and listening to the sound, keep track of the operation of the pump at any time.

③Flow regulation:

The flow regulation of the double pump is usually achieved through the bypass valve. According to actual needs, adjust the opening degree of the bypass valve to achieve the required flow and pressure.


Get the latest price? We'll respond as soon as possible(within 12 hours)