1. Features
High-pressure performance: The PV2R23 series double hydraulic vane pump is specially designed for high-pressure work and can work stably under extremely high pressure, effectively ensuring the reliability and stability of the hydraulic system.
Low noise: The optimized blade design and internal flow channels effectively reduce the noise of the hydraulic oil pump during operation and improve the quality of the working environment.
Long life: The use of high-quality materials and advanced manufacturing technology ensures the long-term stable operation of the pump and reduces the frequency of maintenance and replacement.
Easy to maintain: simple structure, easy disassembly and assembly, reducing maintenance cost and time.
Wide applicability: can be used in various hydraulic systems and mechanical equipment, such as construction machinery, agricultural machinery, shipbuilding industry, etc.
2. Installation Instructions
①Preparation before installation:
Make sure all installation tools and parts are clean and free of debris.
Check the pump body and drive motor for damage or rust.
Confirm that the selected oil meets the use requirements of the pump. The oil model needs to be selected according to the pump's instructions.
②Installation steps:
Select the installation location: Make sure the pump is installed in a stable and easily maintainable location, free from vibration and shock.
Fix the pump body: According to the pump model and installation type (flange or foot type), use appropriate bolts to fix the pump body to the base or frame.
Connecting pipes: Use standard pipes and joints to connect the suction and discharge ports of the pump. Note that the pipe layout should be reasonable and avoid excessive bends or sharp changes to reduce pressure loss and vibration.
Install the drive motor: Install the drive motor on the pump body and ensure that the motor and the drive shaft of the pump body are well aligned. After installation, necessary alignment checks and adjustments must be made.
Wiring: Carry out wiring according to the electrical wiring diagrams of the motor and pump and ensure that the wiring is correct.
③Precautions for use:
Before starting the vane pump, necessary inspections and confirmations should be carried out to ensure that all connections are securely fastened and leak-free.
Start the motor and observe the operation of the pump to check for any abnormal vibration, noise or leakage.
Make necessary adjustments and tests as needed to ensure the pump's performance meets design requirements.
During use, the quality and quantity of the oil should be checked regularly, and seriously contaminated oil should be replaced in time.
Avoid running the pump for a long time in an unloaded or overloaded state to avoid damage to the pump body or motor.
If the pump is found to have abnormal phenomena or failures, it should be stopped in time for inspection and troubleshooting.
In summary, the PV2R23-59-52 vane pump has the characteristics of high pressure performance, low noise, long life, easy maintenance and wide applicability. During installation and use, the above steps and precautions should be followed to ensure the normal operation of the pump and extend its service life.